Problem
The customer experienced a long lead time with a 16-week window to ship castings and was required to pay for them in advance.
Solution
Milwaukee Precision Casting wanted to bring this customer back to the U.S. and gave them a 6-7 week lead time with offer terms.
Services Provided
MPC made new tooling for this customer, and now we make investment castings for them.
Minimal Lead Time
Built for complex applications requiring repeatable accuracy and tight dimensional control across production runs.
Accuracy of ± .005 per inch
ISO-certified quality systems with advanced inspection and full traceability from tooling to delivery.
AMS 2175 Compliance
Fast RFQ response, efficient tooling development, and scalable production capacity to meet your schedule.
Competitive Pricing
Cast, machine, finish, and inspect under one roof — reducing lead times and supply chain complexity.
ISO 9001:2015 Certified
DFM reviews and casting optimization from experienced engineers who understand your application requirements.
Advanced Inspection
X-ray, MPI, FPI, HIPing, and dimensional validation ensure every component meets your spec before shipment.
Get a Quote
Request a Precision
Casting Quote
Upload your drawings or project requirements and our engineering team will review your application — providing technical feedback, material recommendations, and competitive pricing.
Fast RFQ Response
Typical quote turnaround within 1–2 business days
Engineering Support
DFM review and casting optimization included with every quote
Scalable Production
Prototype to high-volume production capability
Full Technical Consultation
Material selection, tolerance review, and process recommendations